Showing posts with label project planning. Show all posts
Showing posts with label project planning. Show all posts

Monday, July 26, 2010

Making Slopers...

I spent some time Saturday making a skirt muslin. Thanks to Alethia taking a full set of measurements for me before I left from my visit with her last week, I finally have accurate measurements some of which are difficult to get on my own. So, I'll be working on a set of slopers. I ordered a fitting pattern, Butterick-B6092While I'm waiting I used a skirt pattern, Butterick-B5466 for the skirt sloper.

I prefer skirts and pants with either facing or a very narrow waist band, so here's my skirt sloper. I'm still deciding which pant pattern I want to use. I've had a real ordeal with pants if you remember from a few posts back...so I'm saving them for last so I don't use up my mojo on pants. I don't want pants with front pleats of side pockets but I want it so the zipper can be back, side or front fly. Fortunately Alethia gave me a few great tips for my pants fitting so maybe this time it will be a better experience. More later...

Happy Sewing!!

Whew, talk about laundry day...

I spent today pre-washing loads of fabric. I unexpectedly had most of the day off because of the bad storm that blew through the Maryland/DC area yesterday, the building where I work was without electricity. I drove in to work to find out the good news...wish I had checked before I left my house. Oh well, not a problem I joyfully drove home...YA! (I felt like doing a happy dance) and got busy washing up most of the fabric I bought in NY last week and several other pieces from my stash that had never been done. Between loads, I also started planning how I was going to make up each piece. Here are all the pieces I pre-washed today, some of the pieces are as much as 6/yds long.

Now just a matter of picking patterns and getting some of this fabric sewed up. Stay tuned, more later...

Happy Sewing!

Related Posts with Thumbnails